# Definition

The Contract Stage Report displays sales order transactions that are currently stuck in the order stage. By default, the report includes the **Processed Flag** and **Error Message** columns. This guide details the steps to access, customize, and download the report to help diagnose and resolve transaction processing issues.

# Guide

## Accessing and configuring the report

To access and configure the Contract Stage Report:

1. **Navigate to the Report:**

* Go to **Reports** and select **Contract Stage Details Report** from the menu.

<Image align="center" border={true} width="80% " src="https://files.readme.io/be81036fc19601f9bcfd024114dbeff55387bff825f1f5a500f0e5fc0700623f-1.Introduction.png" className="border" />

2. **Access the Mapper:**

* Locate and open the report's **Mapper** tool.

3. **Add Required Columns:**

* Within the Mapper, select and add the specific columns (attributes) you wish to include. By default, the report includes the **Processed Flag** and **Error Message** columns.

<Image align="center" border={true} width="60% " src="https://files.readme.io/1cc1ed3d34d9bcb7d464cf21124c7572f73d2c9e362c7eac5331d4874879a8b3-2._Contract_Stage_Report_Mapper.png" className="border" />

4. **Run the Report:**

* Click the **Run** button to generate the report.
* Optionally, click the **Download** button to save the report locally.

## Report columns

* **Processed Flag:** Indicates whether a transaction has been successfully processed. A flag of **"E"** means the transaction has encountered an error, while **"N"** means it has not been processed.
* **Error Message:** Provides detailed information about any errors encountered during processing.

# Contract stage errors

The following table outlines the possible error messages and their potential causes within the Contract Stage Report:

| Error Message                                                      | Possible Reason                                                                                                                                                      |
| ------------------------------------------------------------------ | -------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| Credit Account is Blank                                            | The line stuck has no credit account assigned. Please check the configurations to add in the credit account.                                                         |
| Updated SO Amount is in different sign than previous Billed Amount | The line stuck is an SO update line that has the SO amount in a different sign than the original SO. Positive SO amount cannot be updated with a negative SO amount. |
| Error Processing So update                                         | In case of CMR, when the SO update flows in if the SO update is less than the billed amount, we can get this error.                                                  |
| Updated SO Amount is less than Billed Amount                       | This error indicates that the billed amount is greater than the SO amount. Hence, until we update the SO amount or allow overage, we cannot process this line.       |
| Bundle child updates are not allowed                               | Revenue Recognition does not allow bundle child line updates.                                                                                                        |
| Error Loading SO Line                                              | There could be many reasons for this error.                                                                                                                          |
| Debit Account is Blank                                             | The line stuck has no debit account assigned. Please check the configurations to add in the debit account.                                                           |
| Pob Rule setup is missing in book                                  | The line has no POB rules configured. Please check the POB rules section and configure the POB rules to process this line.                                           |
| Pob setup missing for some lines in this contract in book          | One or more of the lines in the contract are missing POB Rule configuration. Please check and update the POB rules for the concerned lines to process this line.     |

# FAQ

**Q: What does “Debit Account is Blank” or “Credit Account is Blank” mean?**
A: A transaction line is missing its assigned debit or credit account. Review your configuration and assign the correct accounts to the affected lines.

**Q: Why am I seeing “Updated SO Amount is in a different sign than previous Billed Amount”?**
A: The updated Sales Order (SO) amount uses a different sign (positive/negative) than the original billed amount. Ensure the updated SO amount uses the same sign as the original.

**Q: What causes “Error Processing SO update”?**
A: This can occur (e.g., with a Credit Memo Request) when the updated SO amount is less than the amount already billed. Verify the SO update amount; it must not be less than the billed amount.

**Q: What does “Updated SO Amount is less than Billed Amount” mean?**
A: The total billed amount exceeds the SO amount. Increase the SO amount to match or exceed the billed amount, or enable overage per your system policy.

**Q: Why am I getting “Bundle child updates are not allowed”?**
A: Direct updates to bundle child lines aren’t permitted. Make updates on the parent bundle line instead.

**Q: How do I fix “POB Rule setup is missing in the book” or “POB setup missing for some lines in this contract in book”?**
A: One or more lines do not have a Performance Obligation (POB) rule configured. Configure the appropriate POB rules for all missing lines. Note: if any line lacks a POB, the entire contract may remain stuck in Stage.

**Q: What should I do for “Error Loading SO Line”?**
A: The associated SO line hasn’t successfully processed from the contract stage. Resolve the SO in Contract Stage first, then proceed with downstream documents.

**Q: What does “Invalid Cost, SO not present in system” mean?**
A: The SO number in the cost file is incorrect or doesn’t exist. Verify the SO number and re-upload the file.

**Q: Why am I seeing “Bundle child updates are not allowed” in the Cost Stage?**
A: The no-update rule for bundle child lines applies to costs as well. Update costs on the parent bundle line.

**Q: How do I fix “Invalid Cost Type, Cost Type setup is missing”?**
A: The specified Cost Type hasn’t been configured. Add/configure the Cost Type correctly, then re-process.

**Q: What does “Allocated Commission lines cannot be updated” mean?**
A: Lines with allocated commission are locked from updates. Use a new transaction or a reversal rather than editing the original line.

# Sibling pages

* [Revenue insights report](https://docs.recurly.com/recurly-revrec/docs/revenue-insights-report.md)
* [Revenue waterfall report](https://docs.recurly.com/recurly-revrec/docs/revenue-waterfall-report.md)
* [Defer revenue waterfall report](https://docs.recurly.com/recurly-revrec/docs/defer-revenue-waterfall-report.md)
* [Cost details report](https://docs.recurly.com/recurly-revrec/docs/cost-details-report.md)
* [Cost waterfall report](https://docs.recurly.com/recurly-revrec/docs/cost-waterfall-report.md)
* [Cost balances report](https://docs.recurly.com/recurly-revrec/docs/cost-balances-report.md)
* [VC details report](https://docs.recurly.com/recurly-revrec/docs/vc-details-report.md)
* [VC waterfall report](https://docs.recurly.com/recurly-revrec/docs/vc-waterfall-report.md)
* [VC balances report](https://docs.recurly.com/recurly-revrec/docs/vc-balances.md)
* [Contract transaction details report](https://docs.recurly.com/recurly-revrec/docs/contract-transaction-details.md)
* [Billing transaction details report](https://docs.recurly.com/recurly-revrec/docs/billing-transaction-details.md)
* [Cost transaction details report](https://docs.recurly.com/recurly-revrec/docs/cost-transaction-details-report.md)
* [Doc stage details report](https://docs.recurly.com/recurly-revrec/docs/doc-stage-details-report.md)
* [Event stage details report](https://docs.recurly.com/recurly-revrec/docs/event-stage-report.md)
* [Contract balances report](https://docs.recurly.com/recurly-revrec/docs/contract-balances-report.md)
* [Unbilled balances report](https://docs.recurly.com/recurly-revrec/docs/unbilled-balances-report.md)
* [Remaining POB](https://docs.recurly.com/recurly-revrec/docs/remaining-pob.md)
* [Asset balances report](https://docs.recurly.com/recurly-revrec/docs/asset-balances-report.md)
* [Liability balances report](https://docs.recurly.com/recurly-revrec/docs/liability-balances-report.md)
* [User and role access report](https://docs.recurly.com/recurly-revrec/docs/user-and-role-access-report.md)
* [Role details report](https://docs.recurly.com/recurly-revrec/docs/role-details.md)
* [Audit details report](https://docs.recurly.com/recurly-revrec/docs/audit-details-report.md)
* [Config audit report](https://docs.recurly.com/recurly-revrec/docs/config-audit-report.md)
* [Transfer accounting details report](https://docs.recurly.com/recurly-revrec/docs/transfer-accounting-details-report.md)
* [SSP exception report](https://docs.recurly.com/recurly-revrec/docs/ssp-exception-report.md)
* [Hold exceptions report](https://docs.recurly.com/recurly-revrec/docs/hold-exceptions-report.md)